SIGNALactive LAST UPDATE3 minutes ago SOURCES10 monitored Saturday · November 7, 2026
‹ back to feed
Other ·

Hollywood Burbank Airport to Open $1.3B Replacement Terminal on Oct. 13

Hollywood Burbank Airport (BUR) will open its new $1.3 billion replacement terminal on October 13, 2026. The 335,000 sq ft facility features 14 gates, a central TSA checkpoint, and retains the airport's signature ground boarding without jetways

What happened

  • A single central eight-lane TSA checkpoint
  • Ground boarding (no jet bridges), preserving the airport's historic charm
  • Upgraded ADA compliance and seismic standards
  • New baggage screening and a single baggage claim area with three carousels
  • Expanded parking garage and improved dining/shopping The airport serves nine commercial airlines with nonstop flights to approximately 30 destinations in North America. The old terminal will be razed after the new one opens

Hollywood Burbank Airport (BUR) is set to open its new Replacement Passenger Terminal on October 13, 2026. The $1.3 billion project replaces the 96-year-old terminal with a larger 335,000-square-foot facility (up from 232,000 sq ft) while maintaining 14 gates. Key features include:

Sources cited · 1